-
Breytenbach confirms recommending Sibiya for Johannesburg post
-
Court overturns MK party expulsions of Zuma-Sambudla and Ndhlela
-
Celebrities mark Thanksgiving in turkey-themed photo gallery
-
Khloé Kardashian and Malika Haqq dispute surprises mutual friends
-
German fashion model Veruschka dies in Berlin at 87
-
Fight breaks out among fans during Rams-Packers game at SoFi Stadium
-
Thanksgiving storms disrupt thousands of US flights
-
Laura Brand visits Russell Brand in prison with their children
-
T.J. Lang criticises Aaron Rodgers over comments about Mike McCarthy
-
U of C Professor and Residential School Survivor Condemns Denialism
-
Black Friday beauty offers span skincare, fragrance and wellness devices
-
Biography details Johnny Depp’s efforts to leave 21 Jump Street
-
U2 pays tribute to Dolly Parton during Thanksgiving Eve NFL show
-
Rare yellow-bellied sea snake found on Southern California beach
-
Toyota Innova Hycross and Kia Sorento hybrids compared in top trims
-
Second-generation Mini Cooper SE set for India launch with 402km range
-
President Trump to Attend TSMC Groundbreaking in Phoenix Next Week
-
How to Drive a Classic Car Without Ownership: Rental, Clubs, and Track Options
-
Gauteng Health Department Warns of Rising Antibiotic Resistance Threat
-
South African Bail Fund Launches to Address Remand Detention Crisis
-
Bishop Museum Races to Save Rare Megamouth Shark Specimen
-
Qatar Facilities Management Market to Reach $11.15bn by 2032
Spain delays rocket launch until Sept over wildfire risk
The maiden flight of Spain's Miura 1 rocket, twice suspended in recent weeks, has now been delayed until September over fears its launch could start a wildfire, its developer said Tuesday.
Built by private Spanish startup PLD Space, the rocket had initially been scheduled for take-off from El Arenosillo, a coastal military base in the southwestern province of Huelva, on May 31, but was called off due to high winds.
It was then aborted for a second time on June 17 due to a last-minute technical problem.
After talks with the National Institute for Aerospace Technology (INTA), "PLD Space... has postponed the launch of Miura 1 until next September," it said in a statement.
"The postponement is motivated by obligatory compliance with the prevention of forest fires... as well as the high temperatures" in southern Spain "to ensure the safety of the area where the launch is carried out".
The announcement came as Spain was in the grip of its first summer heatwave, with Monday's temperatures hitting a peak of 44.4 degrees Celsius (111.9 degrees Fahrenheit) in the Huelva province.
The soaring temperatures, expected to last until Thursday, raise the risk of forest fires, which has also been heightened by an ongoing drought.
PLD Space's Miura 1, named after a breed of fighting bull, is a small sub-orbital launch vehicle that stands a mere 12 metres (40 feet) tall and is capable of placing objects in space.
When it launches, the rocket is slated to fly just 100 kilometres (62 miles) from the Earth's surface, carrying sensors to study microgravity conditions on a flight that will last 12 minutes.
While that distance would put it in outer space, the rocket is not powerful enough to reach orbit.
The aim is ultimately to use the data for integration into the Miura 5, a larger orbital micro-launcher with parts that can be recovered and reused, which PLD hopes will place small satellites of up to 450 kilograms (around half a ton) into orbit from 2025.
Following an agreement signed last week, the Miura 5 will ultimately be launched from Europe's spaceport in Kourou, French Guiana, according to PLD Space, which is aiming to be the first private European firm to put a reusable satellite launcher into space.
Companies are rushing to develop launchers to address a growing satellite market, with some 18,500 small systems due to be launched in the coming decade, Euroconsult analysts say.
A.Anderson--AT