-
France, Germany reach deal on arms maker KNDS, paving way for IPO
-
Latest developments on Europe's heatwave
-
France set for hottest day yet of heatwave
-
Keir Starmer: downfall of UK's unpopular PM
-
Gaza's surfers seek solace in the sea
-
MEXC Lists Arcium (ARX) with 70,000 USDT in Airdrop+ Rewards
-
EasyJet rejects £5 bn takeover offer from US equity firm
-
Europe scorched by latest heatwave
-
Mediators hail 'progress' in US-Iran talks after lengthy opening session
-
UK's Starmer resigns as prime minister
-
Coffee break: Starbucks Korea stores pause for training after 'Tank Day' fiasco
-
Rightist leaders congratulate Colombian president-elect
-
Rare Philippine school shooting kills three teens, wounds seven
-
Kenya labour minister accused over Russian forced recruitment
-
Crude prices drop after 'positive' US-Iran talks
-
Some France schools closed for day of searing heat
-
Tuchel's England face defensive questions despite flying start at World Cup
-
Frankfurt to All Blacks: New Zealand pick first German-born player
-
Not just a hideout: Sahel forests provide base for jihadists
-
Ageless Messi has World Cup scoring record in his sights
-
Africa faces child surgery crisis as key anaesthesia runs out
-
Trump-backed populist wins razor-tight Colombia vote, sparking protests
-
J-Bay: S.Africa's surf mecca missing out on the global tour
-
'Progress', say mediators, after Iran-US talks towards ending war
-
Key points from the first round of Iran-US talks
-
European countries close schools, cancel trains as heatwave set to intensify
-
Crude prices drop, most stocks rise on 'positive' US-Iran talks
-
'Progress', say mediators, after Iran-US talks on ending war
-
Slimy beans: Japanese natto disgusts and delights the world
-
Clark wins despite hecklers but hopes not to be 'heel of the PGA'
-
Cape Verde targeting World Cup knockout rounds after Uruguay draw: coach
-
Father's Day near-miss at US Open brings Burns to tears
-
New coach Rennie names Savea as All Blacks captain
-
Scheffler praises Clark's resolve in gutsy US Open triumph
-
Yamal kickstarts Spain World Cup bid as Cape Verde stun Uruguay
-
Cape Verde fight back for second World Cup draw against Uruguay
-
Introduces POS Ready for FWA12 to Help Retailers and Restaurants Protect Payment Traffic
-
Best Gold IRA Companies for a 401(k) Rollover in 2026: Expert Rankings Released
-
InterContinental Hotels Group PLC Announces Transaction in Own Shares - June 22
-
Genflow Biosciences PLC Announces Participation at BIO International Convention 2026
-
Guardian Metal Resources PLC Announces Holding(s) in Company
-
Empire Metals Limited Announces Massive High-Grade Core Confirmed at Thomas
-
Apex Drills 14.9 m of 5.09 % REO and 12.3 m of 5.63 % REO with > 2.50 % REO Intercept Over 191.9 m in the Trinity Zone at the Rift Rare Earth Project
-
American Critical Minerals Mobilizes to the Green River Project to Commence Drill Pad Construction
-
CTT Pharma Signs LOI for Clinical Trials and Testing of Nicotine Products
-
Opti Digital Launches Insights Hub, a Unified Intelligence Platform for Publisher Revenue Growth
-
Who is the Best Plastic Surgeon for Skin Removal After Weight Loss?
-
Bear Robotics to Acquire Kinisi Robotics, Completing Its End-to-End Physical AI Robotics Platform
-
Mexican fans rally behind Iran as 'our second team' at World Cup
-
Iran-US talks to continue through the night
Dateline Delivers Further High-Grade Intercepts from North Pipe at Colosseum
SAN BERNARDINO, CALIFORNIA / ACCESS Newswire / December 15, 2025 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is pleased to announce further high-grade drilling results at its 100%-owned Colosseum Gold and Rare Earth Element (REE) Project in San Bernardino County, California. The results from a further twelve reverse circulation (RC) holes drilled below the South and North Pits have provided gold assay results that improve the continuity of mineralisation and in several instances, deliver grades that exceed the existing mineral resource grade.
Of note, RC25-002 and RC25-006 were drilled on the south-east side of the North Pit mineral resource, not far from RC25-001 and RC25-004 that were recently reported (see Figures 1 and 2). This area demonstrates a broad zone of mineralisation with grades comparable with the existing mineral resource but contains a high-grade core (RC25-002 - 10.67m @ 7.27g/t Au, RC25-006 - 13.72m @ 4.48g/t Au) with grades that are significantly higher than the mineral resource.
Highlights
High-grade gold intercepts further strengthen the mineralisation model in the North Pipe:
RC25-002 returned 62.48m @ 2.52 g/t Au from 25.91m
Incl. 10.67m @ 7.27g/t Au from 39.62m
RC25-006 returned 108.20m @ 1.18 g/t Au from 9.14m
Incl. 13.72m @ 4.48g/t Au from 56.39m
RC25-020 returned 117.34m @ 1.01 g/t Au from 0m
Incl. 9.14m @ 1.84g/t Au from 36.57m
Commenting on the new results, Dateline's Managing Director, Stephen Baghdadi, commented:
"These newly reported results come from an area that was sparsely populated in the previous mineral resource model. The overall mineralised envelope and grade matches what we anticipated in this area and the high-grade core has delivered excellent grades and widths.
"The North Pit is currently scheduled to be the first area to be mined in the schedule and the addition of high-grade ounces could improve the mine production in the early years of the project."

Figure 1: Plan view showing drillholes mentioned in this announcement as well as the orientation of the cross section shown in Figure 2.

Figure 2: Cross-section of the Colosseum deposit illustrating the existing open pit outline and gold intercepts
Following the Thanksgiving break, drilling has resumed with one rig before the scheduled Christmas-New Years break.
Assay results will continue to be released as they are received and analysed.
This press release has been authorized for release by the Board of Dateline Resources Limited.
For more information, please contact:
Stephen Baghdadi
Managing Director
+61 2 9375 2353
Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au
Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
Youtube - @dateline.resources
About Dateline Resources Limited
Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1.F) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.
The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.
On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.
The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.
Dateline has also acquired the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.
Forward-Looking Statements
This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.
Competent Person Statement
Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.
Company Confirmations
The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.
SOURCE: Dateline Resources Limited
View the original press release on ACCESS Newswire
A.Taylor--AT