-
Bardot auction in Paris fetches nearly one million euros
-
Flights scrapped, evacuations urged as Typhoon Dujuan wallops Japan
-
No timeline on Daniels injury return, says Commanders coach
-
Fonseca to take break from tennis
-
British Columbia sues OpenAI in US court over Canada school shooting
-
A Cuban zoo, and its animals, in epic battle for survival
-
French star Batum retires after 18-year NBA career
-
Infantino proposes consulting federations to reform FIFA
-
Zidane leads first France training session
-
El Nino weather pattern enters record territory: scientist
-
Man shot by ICE agent in Texas detained with bullet inside him: lawyer
-
OpenAI calls for US to lead global effort on AI standards
-
California declares state of emergency ahead of El Nino
-
South African ostriches plucked alive for luxury fashion: report
-
South Africa arrests three more suspects, after nine women murdered
-
US networks halt Trump coverage in revolt over White House ban
-
Carse needs time away from England, says captain Brook
-
Paramount settles with US states to clear Warner Bros. mega-merger
-
NOWPayments Releases Cross-Chain Payout Data Revealing Key Performance Benchmarks Across TRON, BNB Chain, and Solana
-
Climate crisis a job for world leaders, not just activists: UK FM
-
British Museum bans photos of Bayeux Tapestry as crowds linger
-
US networks halt Trump coverage over White House ban
-
COP31 host says AI climate footprint to be a summit priority
-
French singer accuses Miley Cyrus of plagiarism
-
Berlin's far-left vote winners reject anti-semitism charges
-
EU fines Google 403 mn euros for location data breach
-
Mancini eager for 'new adventure' on Italy return
-
'Best is yet to come,' says De la Fuente after Spain extension
-
Mbappe says having Zidane as France coach 'like a film'
-
Why diesel prices are rising more than crude oil
-
Palmer, Rice out of England Nations League squad
-
COP31 host says AI's climate footprint to be a summit priority
-
German auto workers stage mass protests in bid to save jobs
-
Renewables hit record in 2025, but world must move faster: report
-
Embattled Merz vows to keep ruling for 'democratic future' of Germany
-
US media outlets to sue Trump administration after White House ban
-
Merz vows to keep ruling coalition together for 'democratic future' of Germany
-
Global stocks rally on lower oil prices, US-China hopes
-
Spain coach De la Fuente gets new deal after World Cup success
-
EU proposes energy rating for data centres
-
Pressure grows on Germany's Merz after election defeats
-
Schoolgirl Yu scorches to second gold as doping case rocks Games
-
China's Zhang beats Japan rivals to Asian Games gymnastics gold
-
Putin's party secures record score in Russia election
-
Samlingen Haupt: Vad pengar avslöjar om oss människor
-
Haupt Koleksiyonu: Paranın Biz İnsanlar Hakkında Anlattıkları
-
Tens of thousands of German auto workers protest to save jobs
-
Spanish PM says unregulated AI could be 'devastating'
-
हॉप्त् कलेक्शन: पैसा हमारे बारे में एक इंसान के रूप में क्या प्रकट करता है
-
Yu, 13, smashes record again with second Asian Games gold
GMV Minerals Receives Drill Permits at the Mexican Hat Gold Project
VANCOUVER, BC / ACCESS Newswire / December 4, 2025 / GMV Minerals Inc. (the "Company" or "GMV") (TSXV:GMV)(OTCQB:GMVMF) is pleased to announce that, subject to posting and acceptance of the required reclamation bonding/financial guarantee, it has received the necessary drill permits from the Bureau of Land Management to proceed with its next phase of diamond drilling at its 100% owned Mexican Hat gold project located in SE Arizona (the "Mexican Hat Project").
Harris Exploration Drilling has been chosen to drill approximately 35 holes, totaling approximately 7300 meters of diamond drill core on the Mexican Hat Project. The Company expects the drilling program to commence in early spring 2026.
In consultation with technical advisors, including DRW Geological Consultants Ltd., RESPEC, and others, the diamond drill program is designed to test the resource at different locations to confirm grade variability and further validate the resource to confirm and improve the Mineral Resource categories. A total of 35 diamond drill holes are being considered, testing all of the zones at 100 m +/- by 100 m +/- across the 1,200 m long deposit to 100 m below the depth of the modeled open pit. Geomechanical measurements will be collected to allow for pit optimization.
The Mexican Hat Project's principal controlling structure has been drilled from surface, where it dips 59o to a depth of 250 m below surface where the dip appears to have flattened to 24o. Subsidiary structures appear as splays off of this principal structure (Zones 1 to 6 inclusive) extend up to 220 m into the hanging wall.
Ian Klassen, CEO commented "We are very excited to get underway with the upcoming drill program in early 2026 Receiving the Mexican Hat Project drill authorization is an important milestone for shareholders. With strong historical results and a compelling plan to advance our Company on the heels of a promising PEA, GMV is positioned for a very meaningful drill campaign."
2025 PEA Highlights:
The Company filed the PEA (as defined below) on September 8, 2025, which included that following highlights:
The Base Case generates a pre-tax Internal Rate of Return ("IRR") of 66.1% (after-tax 50.2%) and a pre-tax net present value ("NPV") at a 5% discount rate of US$390.2 million (after-tax US$268.3 million) with a 1.53-year payback (1.82 year after-tax) of invested capital using a US$2,500 per ounce gold price.
Based on price sensitivity analysis at approximately the current price of US$4,000 per ounce of gold, the project returns a pre-tax IRR of 134.2% (after-tax 104.2%) and a pre-tax NPV at a 5% discount rate of US$1.055 billion (after-tax US$744.4 million).
Base Case mine life of 10 years with total production of 597,841 ounces, averaging approximately 60,000 ounces per year.
Crushed mineralized material will be conveyor stacked at a rate of approximately 10,000 tonnes/day on a conventional heap leach pad.
Capex: US$89,997,000 (including US$15.4 million contingency).
Low LOM Strip Ratio of 2.05
Engineering design analysis indicates the potential to increase pit size and contained ounces with increased gold prices.
About GMV Minerals Inc.
GMV Minerals Inc. is a publicly traded exploration company focused on developing precious metal assets in Arizona. GMV, through its 100% owned subsidiary, has a 100% interest in a Mining Property Lease commonly referred to as the Mexican Hat Property, located in Cochise County, Arizona, USA. The project was initially explored by Placer Dome (USA) in the late 1980's to early 1990's. GMV is focused on developing the asset and realizing the full mineral potential of the property through near term gold production. The Company's NI 43-101 resource estimate (Inferred) is 36,733,000 tonnes grading 0.58 g/t gold at a 0.2 g/t cut-off, containing 688,000 ounces of gold, with an effective date of August 8, 2025.
Technical Report and Qualified Persons
The technical report entitled "Updated Preliminary Economic Assessment, Mexican Hat Project" (the "PEA"), with an effective date of August 8, 2025 was prepared by the following Qualified Persons (as defined under NI 43-101), all of whom are independent of the Company:
Mr. Brian Olson, Q.P., Samuel Engineering, Inc. (Metallurgical Test Work and Recovery, Process Plant and Process Operating Costs)
Mr. Steven Pozder, P.E., Samuel Engineering, Inc. (Project Economics and Infrastructure)
Dr. Dave Webb, Ph.D., P.Eng., P.Geo., DRW Geological Consultants Ltd. (Mineral Resource Estimate, Mineral Reserve Estimate, Property Description and Location, Accessibility, Climate, Local Resource, Infrastructure and Physiography, History, Geological Setting and Mineralization, Deposit Types, Exploration, Drilling, Sample Preparation, Analysis and Security, Data Verification).
Mr. Thomas L. Dyer, P.E., RESPEC LLC. (Mine Design, Production Schedule, Capital and Operating Costs)
Mr. Francisco J. Barrios, P.E., BBA Consultants International LP (Pad Design and Loading)
Ms. Dawn Garcia, CPG, PG, Stantec Consulting Services Inc. (Environmental)
Technical Information and Cautionary Note Regarding Inferred Mineral Resources
The mine plan evaluated in the PEA is preliminary in nature and includes Inferred Mineral Resources, as defined by NI 43-101 that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be converted to Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Additional drilling and technical studies will need to be completed in order to fully assess its viability. There is no certainty that a production decision will be made to develop the Mexican Hat Project or that the economic results described in the PEA will be realized. Mine design and mining schedules, metallurgical flow sheets and process plant designs will require additional detailed work and economic analysis and internal studies to ensure satisfactory operational conditions and decisions regarding future targeted production. Key assumptions, qualifications and estimates to the results of the PEA are contained in the PEA.
Cautionary Note to U.S. Investors
The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this report, such as "Measured," "Indicated," "Inferred," and "Resources," that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC.
ON BEHALF OF THE BOARD OF DIRECTORS
________________________________________
Ian Klassen, President
For further information please contact:
GMV Minerals Inc.
Ian Klassen
Tel: (604) 899-0106
Email: [email protected]
Cautionary Statement Regarding Forward-Looking Information
This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Forward-looking information contained in this news release include, but are not limited to, statements or information with respect to: the anticipated drilling program on the Mexican Hat Project, including timing thereof, the results of the PEA, including the IRR and NPV, life of mine and production, capital expenditures, cost estimates; and the mine plan, future plans; mineral resources; and future gold prices. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties as described in the Company's filings with Canadian securities regulators. Assumptions upon which forward-looking information contained in this news release is based, without limitation, include: results of the drill program on the Mexican Hat Project and future exploration; gold prices; accuracy of the results of the PEA, including key assumptions and methods used to determine mineral resources and the results of the PEA; the ability to obtain required permits and approvals; the ability to execute future plans; exchange rates; ability to obtain funding; and changes in regulatory or community environment. Risks, and uncertainties include: results of further drilling and exploration; risks related to mineral tenure, permits and approvals; risks related to the execution of future plans; changes in gold price and exchange rates; risks related to obtaining financing; foreign country risks; regulatory risks and liabilities; and those risks and uncertainties as further described in the Company's filings with Canadian securities regulators which can be found on SEDAR+ at www.sedarplus.ca under the Company's profile. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.
Dr. D.R. Webb, Ph.D., P.Geo., P.Eng. is the Q.P. for this release within the meaning of NI 43-101 and has reviewed the technical content of this release and has approved its content.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SOURCE: GMV Minerals, Inc.
View the original press release on ACCESS Newswire
R.Chavez--AT