-
Mideast war threatens energy crisis worse than 1970s oil shocks
-
Pilot, co-pilot killed in runway collision at New York airport
-
Plane, fire truck collide on runway at New York's LaGuardia Airport
-
Russia's Max: The unencrypted super-app being forced on citizens
-
EU chief in Australia with eyes on trade deal
-
Asia champions Japan need 'different tools' to win World Cup - coach
-
Global economy under 'major threat' from Strait of Hormuz crisis: IEA chief
-
Planet trapped record heat in 2025: UN
-
Israel launches new strikes on Tehran as Iran takes aim at Gulf sites
-
German court to rule in climate case against automakers
-
France's leftists win mayoral elections in largest cities
-
Asian stocks tumble as Trump gives Iran 48-hour ultimatum
-
Wolves rally past Celtics, Nuggets sink Blazers
-
Middle East war to dominate Houston's 'Davos of Energy'
-
Kim holds off Korda charge to win LPGA Founders Cup
-
Trump orders immigration agents to airports amid crippling budget standoff
-
InterContinental Hotels Group PLC Announces Transaction in Own Shares - March 23
-
Just - Evotec Biologics Enters Project Agreement with BARDA to Optimize Biomanufacturing of Antibodies Against Ebola and Related Viruses
-
ABRIDGED, PRELIMINARY AND UNAUDITED QUARTERLY AND FULL YEAR RESULTS AND DETAILS OF MANAGEMENT CONFERENCE Call for the Fourth Quarter and Full Year Ended December 31, 2025 ("The Quarter" or "Q4 2025" and "FY 2025" Respectively)
-
Iran awaits Trump threat to blow up power plants
-
Alcaraz eyes clay court season after early Miami exit
-
Real Madrid down Atletico in derby, leaders Barca edge Rayo
-
Korda sends Alcaraz to another early exit in Miami
-
Bordeaux-Begles hammer Toulouse in Dupont absence
-
Slovenia PM claims election win as results show neck and neck finish
-
England's Fitzpatrick birdies 18th to win PGA Valspar title
-
Man City's League Cup glory adds twist to title race
-
Leftists win mayoral elections in Paris and Marseille
-
Vinicius double helps Real Madrid edge Atletico thriller
-
Doncic cleared to face Pistons after foul rescinded: NBA
-
Inter's Serie A lead cut to six with Fiorentina draw, Como march on
-
World No.1 Alcaraz beaten by Korda in Miami Open third round
-
Cuba starts to restore power after new blackout
-
Ovechkin nets 1,000th combined NHL season-playoffs goal
-
Undav doubles up as Stuttgart down Augsburg to go third
-
Leftists win mayoral elections in Paris and Marseille: projections
-
Israel warns weeks of fighting ahead in Mideast war
-
Guardiola revels in Man City's 'special' League Cup win over Arsenal
-
Hodgkinson headlines Britain's 'Super Sunday' at world indoors
-
Messi scores for Miami in 3-2 MLS victory at NYCFC
-
Bezzecchi wins second race of the season at Brazil MotoGP
-
Britain's Hodgkinson wins world indoor 800m gold
-
Former France and West Ham star Payet announces retirement
-
Man City's O'Reilly savours 'unbelievable' double in League Cup final win
-
Israel to advance ground operations in Lebanon after striking key bridge
-
Man City win League Cup as O'Reilly sinks Arsenal after Kepa blunder
-
Marseille downed by Lille in Ligue 1 as Lyon's struggles continue
-
NBA bans Mitchell, Champagnie one game for sparking melee
-
'Project Hail Mary' rockets to top of N. America box office
-
Syrians protest alcohol sale limits, curbs on personal freedom
Tocvan Announces Maiden Drill Program Underway at North Block Gran Pilar Gold-Silver Project
Highlights:
Maiden Drill Program Underway: targeting a 3.2 km by 1.5 km zone with strong mineralization indicators.
Progress Update: Site preparations complete, including road access and drill pads; initial 2,000 meters of drilling in progress, additional 3,000 meters proposed
Promising Surface Results: High-grade samples from the North Alteration Zone, including 5.6 g/t Au and 106 g/t Ag over 2 meters, and historic workings yielding 3.2 g/t Au and 1,225 g/t Ag.
New Discoveries: Three additional mineralized targets identified with historic underground workings, featuring vein breccia, alteration, and quartz veining.
Strategic Positioning: Fully permitted for over 30,000 meters of drilling; program integrates geophysical, mapping, and geochemical data to expand resource potential and support near-term production goals.
CALGARY, AB / ACCESS Newswire / November 11, 2025 / Tocvan Ventures Corp. (the "Company" or "Tocvan") (CSE:TOC)(OTCQB:TCVNF)(WKN:TV3/A2PE64) is pleased to provide an update on its ongoing maiden drill program at the North Block of the Gran Pilar Gold-Silver Project in Sonora, Mexico. The program, which commenced following the mobilization of equipment in October, marks the first-ever drilling in this underexplored expansion area and is designed to test a 3.2 km by 1.5 km target zone exhibiting strong geochemical and geological indicators of mineralization.
To date, the Company has completed initial site preparations, including road access improvements and the establishment of the first drill pads. Drilling activities are progressing with an initial phase of 2,000 meters planned, focusing on high-priority targets within the North Alteration Zone. These zone have already yielded promising surface samples, including a 2-meter chip sample assaying 5.6 g/t Au and 106 g/t Ag, and a historic mine working sample returning 3.2 g/t Au and 1,225 g/t Ag.
Recent discoveries of two new mineralized targets with historic underground workings further underscore the potential of the area, featuring exposed vein breccia, phyllic and argillic alteration, and quartz veining across sections up to 60 meters.
"We are thrilled with the early progress of our maiden drill program at the North Block, which represents a significant step in unlocking the full potential of the Greater Pilar system," stated Brodie A. Sutherland, CEO of Tocvan Ventures. "The integration of geophysical surveys, surface mapping, and these new target discoveries has refined our approach, and we anticipate meaningful results that could expand our resource potential. Combined with advancements on the South Block, including trenching and pilot mine preparations, Gran Pilar is positioning Tocvan for near-term production and long-term growth."
The North Block forms part of the larger Gran Pilar project, spanning over 22 square kilometers and located in a highly prospective region known for porphyry/ epithermal gold-silver systems. The Company remains fully permitted for over 30,000 meters of drilling and is targeting completion of 3,000 to 5,000 meters by the end of Q4 2025 across both blocks.
Ongoing surface geochemical sampling, geological mapping, and geophysical data interpretation continue to support drill targeting. Tocvan will provide further updates as assay results become available and drilling advances.

100% CONTROLLED PRIORITY TARGETS FOR TRENCHING & DRILLING
South Block Main Zone Expansion
Follow-up on 2025 Drill Success
19.4 g/t Au over 3.1 meters within 106.6 meters of 0.6 g/t Au (February 25, 2025 News Release)
5.4 g/t Au over 6.1 meters within 41.2 meters of 1.0 g/t Au (May 7, 2025 News Release)
136 g/t Ag over 10.7 meters within 42.7 meters of 41 g/t Ag (June 25, 2025 News Release)
South Block (November 12, 2024 News Release)
Placer Corridor (900-meter strike length)
Soil samples up to 21.2 g/t Au and >2,000 g/t
Placer Source Area
Soil samples up to 2.4 g/t Au and 22 g/t Ag
Rock samples up to 7.3 g/t Au and 389 g/t Ag
North Block
North Alteration Zone (3.2 km by 1.5 km area)
2-meter chip sample, 5.6 g/t Au and 106 g/t Ag (October 19, 2023 News Release)
Historic mine working sample, 3.2 g/t Au and 1,225 g/t Ag (March 8, 2024 News Release)

Gran Pilar Drill Highlights:
2025 Diamond Drilling Highlights include:
83.5m @ 1.3 g/t Au, including 9.7m @ 10.3 g/t Au (March 11, 2025 News Release)
97.4m @ 0.7 g/t Au, including 36.3m @ 1.6 g/t Au (March 19, 2025 News Release)
64.9m @ 1.2 g/t Au, including 3.0m @ 21.6 g/t Au and 209 g/t Ag (March 26, 2025 News Release)
46.9m @ 0.5 g/t Au, including 2.6m @ 7.2 g/t Au and 80 g/t Ag (April 16, 2025 News Release)
2025 RC Drilling Highlights include:
106.8m @ 0.6 g/t Au, including 3.1m @ 19.4 g/t Au (February 25, 2025 News Release)
41.2m @ 1.0 g/t Au, including 6.1m @ 5.4 g/t Au (May 7, 2025 News Release)
2024 RC Drilling Highlights include (all lengths are drilled thicknesses):
42.7m @ 1.0 g/t Au, including 3.1m @ 10.9 g/t Au
56.4m @ 1.0 g/t Au, including 3.1m @ 14.7 g/t Au
16.8m @ 0.8 g/t Au and 19 g/t Ag
2022 Phase III Diamond Drilling Highlights include (all lengths are drilled thicknesses):
116.9m @ 1.2 g/t Au, including 10.2m @ 12 g/t Au and 23 g/t Ag
108.9m @ 0.8 g/t Au, including 9.4m @ 7.6 g/t Au and 5 g/t Ag
63.4m @ 0.6 g/t Au and 11 g/t Ag, including 29.9m @ 0.9 g/t Au and 18 g/t Ag
2021 Phase II RC Drilling Highlights include (all lengths are drilled thicknesses):
39.7m @ 1.0 g/t Au, including 1.5m @ 14.6 g/t Au
47.7m @ 0.7 g/t Au including 3m @ 5.6 g/t Au and 22 g/t Ag
29m @ 0.7 g/t Au
35.1m @ 0.7 g/t Au
2020 Phase I RC Drilling Highlights include (all lengths are drilled thicknesses):
94.6m @ 1.6 g/t Au, including 9.2m @ 10.8 g/t Au and 38 g/t Ag;
41.2m @ 1.1 g/t Au, including 3.1m @ 6.0 g/t Au and 12 g/t Ag ;
24.4m @ 2.5 g/t Au and 73 g/t Ag, including 1.5m @ 33.4 g/t Au and 1,090 g/t Ag
15,000m of Historic Core & RC drilling. Highlights include:
61.0m @ 0.8 g/t Au
21.0m @ 38.3 g/t Au and 38 g/t Ag
13.0m @ 9.6 g/t Au
9.0m @ 10.2 g/t Au and 46 g/t Ag
Pilar Bulk Sample Summary:
62% Recovery of Gold Achieved Over 46-day Leaching Period
Head Grade Calculated at 1.9 g/t Au and 7 g/t Ag; Extracted Grade Calculated at 1.2 g/t Au and 3 g/t Ag
Bulk Sample Only Included Coarse Fraction of Material (+3/4" to +1/8")
Fine Fraction (-1/8") Indicates Rapid Recovery with Agitated Leach
Agitated Bottle Roll Test Returned Rapid and High Recovery Results: 80% Recovery of Gold and 94% Recovery of Silver after Rapid 24-hour Retention Time
Additional Metallurgical Studies:
Gravity Recovery with Agitated Leach Results of Five Composite Samples Returned
95 to 99% Recovery of Gold
73 to 97% Recovery of Silver
Includes the Recovery of 99% Au and 73% Ag from Drill Core Composite at 120-meter depth.
About Tocvan Ventures Corp.
Tocvan Ventures Corp. is a dynamic exploration and near-term producer advancing high-potential gold and silver projects in the mine-friendly jurisdiction of Sonora, Mexico. At its flagship Gran Pilar Gold-Silver Project, Tocvan holds a 100% interest in over 21 km² of prospective ground, bolstered by the pivotal 2023 land acquisition that provides ample space for scalable mine infrastructure, including a planned 50,000-tonne pilot production facility. The Company also maintains a 51% interest in a 1 km² joint venture area with Colibri Resources, further expanding its footprint. Recent exploration successes, including near surface 3.1 meters at 19.4 g/t Au, underscore Gran Pilar's potential as a premier gold-silver asset. Additionally, Tocvan's 100% owned Picacho Gold-Silver Project, located in the prolific Caborca Trend-home to some of Mexico's largest gold deposits-positions the Company for further growth. With robust metallurgical results (up to 99% gold and 97% silver recovery) and a strategic capital to bolster growth, Tocvan is poised to deliver significant shareholder value in a market buoyed by record-high gold prices. With approximately 66 million shares outstanding, Tocvan is committed to unlocking the full potential of its assets through innovative exploration, strategic development, and investor-focused initiatives.
Quality Assurance / Quality Control
Rock and Drill samples were shipped for sample preparation to ALS Limited in Hermosillo, Sonora, Mexico and for analysis at the ALS laboratory in North Vancouver. The ALS Hermosillo and North Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Gold was analyzed using 50-gram nominal weight fire assay with atomic absorption spectroscopy finish. Over limits for gold (>10 g/t), were analyzed using fire assay with a gravimetric finish. Silver and other elements were analyzed using a four-acid digestion with an ICP finish. Over limit analyses for silver (>100 g/t) were re-assayed using an ore-grade four-acid digestion with ICP-AES finish. Control samples comprising certified reference samples and blank samples were systematically inserted into the sample stream and analyzed as part of the Company's robust quality assurance / quality control protocol.
Soil Samples were shipped for sample preparation to ALS Limited in Hermosillo, Sonora, Mexico and for analysis at the ALS laboratory in North Vancouver. The ALS Hermosillo and North Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Gold and multi-element analysis of soils was completed by aqua regia digestion and ICP-MS finish using a 50-gram nominal weight. Over limit gold values greater than 1 g/t were re-assayed with a more robust aqua regia digestion ad ICP-MS finish. Over limit analyses for silver (>100 g/t) were re-assayed using an ore-grade four-acid digestion with ICP-AES finish. Control samples comprising blank samples and certified reference materials were systematically inserted into the sample stream and analyzed as part of the Company's robust quality assurance / quality control protocol.
Brodie A. Sutherland, CEO for Tocvan Ventures Corp. and a qualified person ("QP") as defined by Canadian National Instrument 43-101, has reviewed and approved the technical information contained in this release.
Cautionary Statement Regarding Forward Looking Statements
Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release contains "forward-looking information" which may include, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future. Forward-looking information in this news release includes statements regarding the use of proceeds from the Offering. Such forward-looking information is often, but not always, identified by the use of words and phrases such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.
These forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business. Management believes that these assumptions are reasonable. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others, risks related to the speculative nature of the Company's business, the Company's formative stage of development and the Company's financial position. Forward-looking statements contained herein are made as of the date of this news release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws.
There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.
For more information, please contact:
TOCVAN VENTURES CORP.
Brodie A. Sutherland, CEO
1150, 707 - 7 Ave SW
Calgary, Alberta T2P 3H6
Telephone: 1 888 772 2452
Email: [email protected]
STAY CONNECTED:
LinkedIn: TOC LinkedIn
X: TOC X
Facebook: TOC Facebook
YouTube: TOC YouTube
Web: tocvan.com
SOURCE: Tocvan Ventures Corp
View the original press release on ACCESS Newswire
A.Ruiz--AT