-
India Imposes 162.5% Duty on Bulk Scotch Imports Amid UK Trade Pact Dispute
-
GTA 6 Release Date Confirmed for November 19; Troubleshooting Pre-load and Launch Errors
-
Peaceful Repeat Vote in Douglas Ward 3 Amid Heightened Security
-
‘They want silence’: how the film NAZA is shaking Israel
-
Belgian Ambassador Marks King’s Day in Athens Amidst Strong Bilateral Trade Ties
-
Dún Laoghaire-Rathdown €335m Budget Faces Mixed Reaction Over Housing and Cost of Living
-
Rediff.com IPO Risks: Gmail Dominance and New Business Ventures
-
BING X: 22,624.66 SNC have disappeared at BingX – how safe are tokens on BingX? Will BingX’s MiCAR licence be suspended?
-
Dubai Police Expand Luxury Patrol Fleet with 525-hp Defender
-
Iran Strikes US Sites in Kuwait Following US Airstrikes on Qeshm Island
Enel to Install Solar Panels at Niterói Waste Management Facility
Enel do Rio announced on Tuesday that it will install 240 photovoltaic panels and a solar water heating system at the Niterói Sanitation Company (Clin). The project aims to reduce electricity consumption and modernize facilities, with savings potentially redirected to other operational areas. This initiative is part of a larger R$10.4 million investment package distributed across ten selected projects in Rio de Janeiro state.
Enel do Rio announced on Tuesday that it will install 240 photovoltaic panels and a solar water heating system at the Niterói Sanitation Company (Clin). The project aims to reduce electricity consumption and modernize facilities, with savings potentially redirected to other operational areas. This initiative is part of a larger R$10.4 million investment package distributed across ten selected projects in Rio de Janeiro state.
The installation will take place at the Clin facility in Niterói and the Marine Corps Base on Ilha das Flores in São Gonçalo. The primary objective is to decrease reliance on grid electricity by incentivizing the switch to solar power. While the specific investment value for the Clin project was not disclosed, the broader package totals R$10.4 million.
The funds are part of a public call launched in 2026, designed to support ten selected projects across municipalities in Rio de Janeiro state. The economic savings generated from reduced energy costs at the Clin facility may allow the company to allocate resources to other areas. No further financial details regarding the specific allocation for Niterói were provided.
The initiative aligns with Enel's broader strategy to modernize infrastructure and promote renewable energy adoption in public facilities within the state.
G.P.Martin--AT